History: P.A. 05-287 effective July 13, 2005.
PART II
BIDDING AND CONTRACTS
Sec. 4b-91. (Formerly Sec. 4-137a). Bidding for public building contracts. Prequalification requirements. (a) Every contract for the construction, reconstruction,
alteration, remodeling, repair or demolition of any public building for work by the state,
which is estimated to cost more than five hundred thousand dollars, except (1) a contract
awarded by the Commissioner of Public Works for (A) a community court project, as
defined in subsection (j) of section 4b-55, (B) the downtown Hartford higher education
center project, as defined in subsection (l) of section 4b-55, (C) a correctional facility
project, as defined in subsection (m) of section 4b-55, (D) a juvenile detention center
project, as defined in subsection (n) of section 4b-55, or (E) a student residential facility
for the Connecticut State University system that is a priority higher education facility
project, as defined in subsection (f) of section 4b-55, or (2) a project, as defined in
subdivision (16) of section 10a-109c, undertaken and controlled by The University of
Connecticut in accordance with section 10a-109n, shall be awarded to the lowest responsible and qualified general bidder who is prequalified pursuant to section 4a-100 on the
basis of competitive bids in accordance with the procedures set forth in this chapter,
after the Commissioner of Public Works or, in the case of a contract for the construction
of or work on a building under the supervision and control of the Joint Committee on
Legislative Management of the General Assembly, the joint committee or, in the case
of a contract for the construction of or work on a building under the supervision and
control of one of the constituent units of the state system of higher education, the constituent unit, has invited such bids by advertisements inserted at least once in one or more
newspapers having a circulation in each county in the state. The Commissioner of Public
Works, the joint committee or the constituent unit, as the case may be, shall indicate
the prequalification classification required for the contract in such advertisement. As
used in this section, "prequalification classification" means the prequalification classifications established by the Commissioner of Administrative Services pursuant to section
4a-100.
(b) The Commissioner of Public Works, the joint committee or the constituent unit,
as the case may be, shall determine the manner of submission and the conditions and
requirements of such bids, and the time within which the bids shall be submitted, consistent with the provisions of sections 4b-91 to 4b-96, inclusive. Such award shall be made
within sixty days after the opening of such bids. If the general bidder selected as the
general contractor fails to perform the general contractor's agreement to execute a contract in accordance with the terms of the general contractor's general bid and furnish a
performance bond and also a labor and materials or payment bond to the amount specified in the general bid form, an award shall be made to the next lowest responsible and
qualified general bidder. No employee of the Department of Public Works, the joint
committee or a constituent unit with decision-making authority concerning the award
of a contract and no public official, as defined in section 1-79, may communicate with
any bidder prior to the award of the contract if the communication results in the bidder
receiving information about the contract that is not available to other bidders, except
that if the lowest responsible and qualified bidder's price submitted is in excess of funds
available to make an award, the Commissioner of Public Works, the Joint Committee
on Legislative Management or the constituent unit, as the case may be, may negotiate
with such bidder and award the contract on the basis of the funds available, without
change in the contract specifications, plans and other requirements. If the award of a
contract on said basis is refused by such bidder, the Commissioner of Public Works,
the Joint Committee on Legislative Management or the constituent unit, as the case may
be, may negotiate with other contractors who submitted bids in ascending order of bid
prices without change in the contract, specifications, plans and other requirements. In
the event of negotiation with general bidders as provided in this section, the general
bidder involved may negotiate with subcontractors on the same basis, provided such
general bidder shall negotiate only with subcontractors named on such general bidder's
general bid form.
(c) On and after October 1, 2004, no person may bid on a contract, except for a
project described in subdivision (2) of subsection (a) of this section, for the construction,
reconstruction, alteration, remodeling, repair or demolition of any public building for
work by the state or a municipality, which is estimated to cost more than five hundred
thousand dollars and is paid for, in whole or in part, with state funds, unless the person
is prequalified in accordance with section 4a-100.
(d) On and after October 1, 2004, each bid submitted for a contract described in
subsection (c) of this section shall include a copy of a prequalification certificate issued
by the Commissioner of Administrative Services. The bid shall also be accompanied
by an update statement in such form as the Commissioner of Administrative Services
prescribes. The form for such update statement shall provide space for information
regarding all projects completed by the bidder since the date the bidder's prequalification
certificate was issued or renewed, all projects the bidder currently has under contract,
including the percentage of work on such projects not completed, the names and qualifications of the personnel who will have supervisory responsibility for the performance
of the contract, any significant changes in the bidder's financial position or corporate
structure since the date the certificate was issued or renewed, any change in the contractor's qualification status as determined by the provisions of subdivision (6) of subsection
(c) of section 4a-100 and such other relevant information as the Commissioner of Administrative Services prescribes. Any bid submitted without a copy of the prequalification
certificate and an update statement shall be invalid.
(e) Any person who bids on a contract described in subsection (c) of this section
shall certify under penalty of false statement at the conclusion of the bidding process
that the information in the bid is true, that there has been no substantial change in the
bidder's financial position or corporate structure since the bidder's most recent prequalification certificate was issued or renewed, other than those changes noted in the update
statement, and that the bid was made without fraud or collusion with any person.
(f) Any person who receives information from a state employee or public official
that is not available to the general public concerning any construction, reconstruction,
alteration, remodeling, repair or demolition project on a public building prior to the date
that an advertisement for bids on the project is published shall be disqualified from
bidding on the project.
(g) Notwithstanding the provisions of this chapter regarding competitive bidding
procedures, the commissioner may select and interview at least three responsible and
qualified general contractors who are prequalified pursuant to section 4a-100 and submit
the three selected contractors to the construction services award panels process described
in section 4b-100a and any regulation adopted by the commissioner. The commissioner
may negotiate with the successful bidder a contract which is both fair and reasonable
to the state for a community court project, as defined in subsection (j) of section 4b-55,
the downtown Hartford higher education center project, as defined in subsection (l) of
section 4b-55, a correctional facility project, as defined in subsection (m) of section 4b-55, a juvenile detention center project, as defined in subsection (n) of section 4b-55, or
a student residential facility for the Connecticut State University system that is a priority
higher education facility project, as defined in subsection (f) of section 4b-55. The Commissioner of Public Works, prior to entering any such contract or performing any work
on such project, shall submit such contract to the State Properties Review Board for
review and approval or disapproval by the board, pursuant to subsection (i) of this
section. Any general contractor awarded a contract pursuant to this subsection shall be
subject to the same requirements concerning the furnishing of bonds as a contractor
awarded a contract pursuant to subsection (b) of this section.
(h) On and after October 1, 2004, any agency that seeks to have a project awarded
without being subject to competitive bidding procedures shall certify to the joint committee of the General Assembly having cognizance of matters relating to government administration and elections that the project is of such an emergency nature that an exception to the competitive bidding procedures of this section is required. Such certification
shall include input from all affected agencies, detail the need for the exception and
include any relevant documentation.
(i) In the event that the General Assembly approves legislation authorizing an exception to the competitive bidding process for a project, the State Properties Review
Board shall complete a review of the contract for such project and approve or disapprove
such contract no later than thirty days after the Commissioner of Public Works submits
such contract to the board. Such review shall be conducted in accordance with the provisions of section 4b-3. In the event that such review does not occur within the thirty-day
period prescribed by this subsection, such contract shall be deemed to be approved.
(P.A. 73-528, S. 1, 12; P.A. 74-246, S. 1, 11; P.A. 75-425, S. 23, 57; P.A. 77-614, S. 73, 610; P.A. 82-438, S. 5, 6; 82-447, S. 1; P.A. 84-48, S. 12, 17; P.A. 87-496, S. 41, 110; 87-529, S. 5; P.A. 88-116, S. 4; P.A. 89-353, S. 3, 8; P.A. 92-228, S. 6, 9; P.A. 93-30, S. 4, 14; May Sp. Sess. P.A. 94-2, S. 5, 203; P.A. 95-230, S. 39, 45; P.A. 96-235, S. 14, 19; P.A.
97-293, S. 21, 26; P.A. 98-21, S. 4; 98-59, S. 2, 3; P.A. 99-26, S. 4, 39; 99-75, S. 8; 99-241, S. 50, 66; P.A. 00-192, S. 17,
102; P.A. 02-140, S. 3; P.A. 03-215, S. 1; P.A. 04-141, S. 1; P.A. 05-287, S. 10, 11.)
History: P.A. 74-246 required award of bid within sixty days of bid opening rather than previous ninety days and
clarified procedure for negotiation of contract when bids exceed available funds and including provision for negotiations
between bidders and sub-bidders; P.A. 75-425 required bidding on projects estimated to exceed two hundred fifty thousand
dollars rather than five hundred thousand dollars as previously; P.A. 77-614 replaced public works commissioner with
commissioner of administrative services; P.A. 82-438 provided that legislative management committee is responsible for
bidding procedures involving work on the state capitol building; P.A. 82-447 amended section to replace references to
sub-bidders with references to subcontractors; P.A. 84-48 included any construction of or work on any building under the
supervision and control of the joint committee on legislative management as being under the control of said committee
where "state capitol building" was previously mentioned; P.A. 87-496 replaced administrative services commissioner with
public works commissioner; P.A. 87-529 provided that a constituent unit of the state system of higher education is responsible for bidding procedures involving work on a building under the supervision of the constituent unit; P.A. 88-116 added
provision re manner, conditions, requirements and time for bids; Sec. 4-137a transferred to Sec. 4b-91 in 1989; P.A. 89-353 designated existing section as Subsec. (a), exempted emergency correctional facility project from Subsec. (a) and
added Subsec. (b) re procedure for award of contract for emergency correctional facility project to a general contractor;
P.A. 92-228 amended Subsec. (a) by adding Subdivs. (2) and (3), exempting large public building project and construction
management contracts from requirements of Subsec. (a); P.A. 93-30 made a technical change in Subsec. (a), effective July
1, 1993; May Sp. Sess. P.A. 94-2 exempted the University of Connecticut library project from Subsec. (a) and included
said project in provisions of Subsec. (b), effective July 1, 1994; P.A. 95-230 amended Subsec. (a) to add exception for The
University of Connecticut and made technical changes to the lettering and numbering, effective June 7, 1995; P.A. 96-235
amended Subsec. (a)(1) by repealing exemption from competitive bidding requirements for large public building projects
and construction management, as defined in Sec. 4b-98, which was repealed elsewhere in the act, effective June 6, 1996;
P.A. 97-293 made a technical change in Subsec. (a), effective July 1, 1997; P.A. 98-21 amended Subsec. (a) to exempt a
community court project and amended Subsec. (b) to include a community court project; P.A. 98-59 changed effective
date of P.A. 98-21 from October 1, 1998, to April 13, 1998; P.A. 99-26 amended Subsec. (a) to exempt the Connecticut
Juvenile Training School project, amended Subsec. (b) to include said project and made technical changes, effective May
7, 1999; P.A. 99-75 substituted "five hundred thousand dollars" for "two hundred fifty thousand dollars" in Subsec. (a),
deleted references to "an emergency correctional facility project" and made technical changes; P.A. 99-241 added the
downtown Hartford higher education center and made technical changes, effective June 28, 1999; P.A. 00-192 amended
Subsecs. (a) and (b) to include correctional facility project and juvenile detention center project, effective July 1, 2000;
P.A. 02-140 amended Subsecs. (a) and (b) by adding provisions re student residential facilities and made technical changes
in Subsec. (b), effective July 1, 2002; P.A. 03-215 amended Subsec. (a) to reference prequalified contractors and require
that advertisements indicate the prequalification and aggregate work capacity rating, designated part of Subsec. (a) as
Subsec. (b), adding prohibition on communications with a bidder prior to the award of a contract and making technical
changes therein, inserted new Subsec. (c) re prequalification, inserted new Subsec. (d) re update statement, inserted new
Subsec. (e) re certification under penalty of false statement, inserted new Subsec. (f) re receipt of information not available
to the general public and relettered former Subsec. (b) as Subsec. (g), referencing prequalification and selection by the
award panel and requiring certification to legislative management committee re emergency nature of projects therein,
effective October 1, 2004; P.A. 04-141 amended Subsec. (a) to delete reference to Sec. 4b-24(4), i.e. Sec. 9 of P.A. 03-215, eliminate requirement that the Commissioner of Public Works, the joint committee or the constituent unit indicate
the aggregate work capacity rating required for the contract in the advertisement and delete definition of aggregate work
capacity rating, amended Subsec. (b) to prohibit public official, as defined in Sec. 1-79, from communicating with any
bidder prior to the award of the contract if the communication results in the bidder receiving information about the contract
not available to other bidders, made technical changes in Subsec. (d), amended Subsec. (f) to include receipt of information
from a state employee, made technical changes in Subsec. (g) and added requirement that the Commissioner of Public
Works submit contract to the State Properties Review Board for review and approval or disapproval, designated provisions
re agency seeking to have project awarded without being subject to competitive bidding procedures on and after October
1, 2004, as Subsec. (h) and amended said Subsec. to require certification for such project to the government administration
and elections committee rather than the legislative management committee and made technical changes, and added Subsec.
(i) re review of contract for approved project by the State Properties Review Board; P.A. 05-287 amended Subsec. (a)(1)
to delete exceptions in former Subparas. (B) and (D) for the Connecticut Juvenile Training School project and The University
of Connecticut library project and redesignate existing Subpara. (C) as new Subpara. (B), and existing Subparas. (E) to
(G), inclusive, as new Subparas. (C) to (E), inclusive, and amended Subsec. (g) to remove The University of Connecticut
library project and the Connecticut Juvenile Training School project from the list of projects for which the commissioner
may negotiate a contract with the successful bidder, effective July 13, 2005.